Showing posts with label move-in fees. Show all posts
Showing posts with label move-in fees. Show all posts

Wednesday, March 13, 2013


Minutes of the Trustee Meeting
Queensberry Condominium Trust
March 11, 2013

Pursuant to the Article V.  Section 5.9 of the By-Laws of Queensberry Condominium Trust,  a special meeting in lieu of the annual meeting of unit owners was held on Monday,  March 11,  2013, at 7:00PM at the offices of Boston Choice Properties, 125 Jersey Street, Boston, MA.

Those Present:  Ning Hernandez 111-05, Sheryl Kelly 111-19, Jeff Schwarz  111-17 and Michael Grappo 107-4 & 107-8, Trustees

Sarah Park  106-6, Max Compagnon  107-11 (proxy Michael Grappo), Michael Vounatsos  107-9 & 107-15 (Proxy Sheryl Kelly)  Robert Mersereau 111-12, Ria Jauw 111-14 , & Richard Bettano 111-15, Unit Owners

Pamela Pendias,  Modica Associates 

23.74%  of the beneficial interest was present either in person or by proxy.   Since a quorum was not present no formal business could be conducted.  An informational meeting was held for those owners who were present.

Pam  called the meeting  to order at 7:10 PM.  

OLD BUSINESS  


Owners were furnished with the balance sheet as of December 31, 2012,  reflecting $5,577 in the operating account and $59,373  in the reserve (savings) account.    At Year End the association was current with all operating bills and with the exception of one owner, everyone is current with their condo fees.

For the most part the budget was accurate and condominium fee revenues  are sufficient to meet operating expenses.    Line items that were significantly over budget include oil and capital repairs .   The building converted to gas last year so the line item for oil was eliminated in the operating budget for 2012.   However the association paid for December oil deliveries in January resulting in an overage of $9,409.   The other item that exceeded budget was capital repairs,$81,355,  since nothing was budgeted for this line item.    The association made two notable capital improvements to the building last year;  the courtyard at the rear of the property was replaced and new drainage installed  to eliminate standing water and the wrought iron  railing running along the perimeter of the property was replaced.   Both projects cost $15,100  each for a total of $30,200. 

The association had two insurance losses last year.   In January 2012 one of the heating boilers cracked.    A claim was filed under the master policy for the building to help defray the cost of furnishing and installing a new heating boiler $30,000.    There is a $15,000 deductible under the master policy,    There was also an insurance claim filed in June 2012 when  two different pipe  breaks were discovered  under the floor of 111-20A.    While insurance does not cover the cost of repairing the lines, it does cover the cost of cosmetic repairs in the unit, replacing carpet  and floors that needed to be removed in order to access the two breaks in the pipe under the floor.     Other capital expenses include  $22,200, final payment to the contractor for  replacing roof in 2011 and lining the chimney $2,650 associated with the converting the building from oil to gas heating.    

NEW BUSINESS

Along with the year end figures owners were furnished with a new operating budget for F/Y 2013, which for the most part remains the same with no increase in condo fees.     Owners were furnished with a balance sheet as of February
28, 2013 along with copies of the bank reconciliation and bank statements reflecting $5,340 in the operating
Minutes of the Annual Meeting
3-11-13
Page Two

 (checking) account and $62,088 in the reserve (savings) account.

At the end of February, the association has a net loss of $237.   Items over budget at this time include gas, and snow removal which will even out as the year progresses.    The financial statements are done on a cash and not accrual basis.

The next item of business was the election of five trustees to serve a one-year term.    The incumbent trustees all indicated that they would be seeking re-election.    Pam stated that she had heard from no other unit owner wishing to serve as a trustee.     The incumbent trustees were all re-elected by acclamation by those unit owners present.

OTHER BUSINESS

Pam noted that more often than not, the gates behind the rear of the property are left ajar.   Sara Park stated that tenants in the basement prop the rear doors and gate to the courtyard open to allow guests access for weekend parties and smoking in the courtyard.    The courtyard is a common area and smoking is not permitted in the common areas, hallways, stairwells, etc.   Sheryl Kelly suggested that Modica obtain a proposal for furnishing and installing door closers on all (3) gates as residents are not closing them.   Sheryl did note a problem with the gate at 107 Jersey Street not latching.   Pam stated she would look into it and have it repaired.    

Richard Bettano suggested the name of a local landscaper the association may wish to consider using this year to spruce up curb appeal.    Pam said she would call, Peggy Prentice at Green Pea Gardens for an estimate.  

Pam was informed that a new tenant moved into 111-16 recently.    Unfortunately investor owners often times neglect to inform management when there is a change in occupancy in their respective units.    Sheryl suggested that Modica draft a letter for new tenants informing them of the building rules governing trash, quiet hours, monthly pest control, removal of A/C’s and need to register bikes.     Pam to contact the owner of 111-16, get the name of the tenant ane charge the owner the requisite $150 move-in fee.     The only real control Modica has is when new residents call requesting to be listed on the directory located in the foyer of each building.  

Someone asked about the pipes in the courtyard.   Pam stated that they were kept for the insurance company so they could see the damage associated with the corroded steam pipes resulting in the most recent insurance loss for the association.   

Sheryl had questions about the costs associated with snow removal and did not see any consistency in the billing.   Pam stated that there were up charges for removing snow on weekends and holidays but will send Sheryl and all board members a copy of the snow removal services that Modica has been providing at the building.

Robert  Mersereau asked if something could be done about the ponding water on the sidewalk at the entrance to the courtyard suggesting that the drain should be checked in that area.   Modica will arrange for this.

There being no further business, the meeting adjourned at  7:50 PM. 

Respectfully submitted by:
Pamela Pendias
Modica Associates
For the Recording Secretary
Queensberry Condominium Trust

Monday, May 17, 2010

April 20, 2010, Meeting

Attending:

Corinne Getchell (MA) --Modica Associates
Yelena Chigirinskaya (YC) --Trustee, Queensberry Condominium Trust
Douglas McClennen (DM) --Trustee, Queensberry Condominium Trust
Bill Gentz (BG) --Trustee, Queensberry Condominium Trust
Ning Hernandez (NH) --Trustee, Queensberry Condominium Trust
Distribute to:
David Sherf (DS) --Trustee, Queensberry Condominium Trust
107 Mail Room for general information111 Mail Room for general information

Window Replacement
MA sent the letter and gave Hadco 30 days to reply. If there is no response, the next step would be for David to send a letter to Hadco.

Bad Smell in 107
The smell has returned in 107 (see email from 4/15). The smoke test will be performed to determine where the sewage smell comes from and how bad the damage might be. Smoke test is currently scheduled for Thursday if the city sewage lines are cleared by then on the corner of Queensberry and Jersey Streets.

107 Laundry Room Floor
On hold until the smoke test is done.

Landscaping
The board met with Rick Malkasian (of Rick Malkasian Gardens—the company that has been doing our landscaping so far) to discuss improving the plantings around the building. The board decided to ask Malkasian to work with $1000 (total, labor inclusive) to add plantings and improve the landscaping with the following specific requests: 1) no arbovitaes, 2) add approximately $100 worth of annuals in locations Malkasian sees fit. The board would like this landscaping work to begin right away.

The board also discussed the linden tree (city tree) near 111 Jersey entrance with MA and Malkasian. (Some of the tree branches are growing into the fire escape of 111, and thus may be a fire hazard.) MA will find out the price for cutting down the branch closest to the building. MA will also find out the price for spraying the Jersey side linden tree and another linden tree (also a city tree) on Queensberry side of the building. MA will also find out if we need city permission to cut down branch and/or spray these city trees.

Terrazzo Sidearms Need Repairs
Chicarelli will not do the work. MA will talk to B&M Restoration about cost for applying partial fix.

Water Damage/Leaks Due to the March 15 Storm
Contractors fixed the problem with the damaged door of 107-19 (put in the new beam), and found no structural damage. DM did not like the quality of these contractors’ work. (They were Wolf Rock Construction).

Roof repairs (excluding skylights) to take place tomorrow. (A skylight is the owner’s responsibility. Skylight in 107-18 failed a long time ago and was sealed incorrectly. This improper seal now increased the effects of the leak. (Both skylights in 107-18 and in 107-19 are old. The skylight in 107-19 has been patched, but its seal was done correctly as opposed to the one in 107-18.)

MA to notify unit owners that skylights need to be replaced, and give them 60 days to do it. 107-18 and 107-19 both need higher curbs and/or better curbs. MA to ask them to present specs for the work before the work is done to protect the common areas. The board will review the specs promptly (within 3 business days) not to hold up the work.

The board questioned why the improper seal was not discovered earlier and proposed to add inspection of all skylights to our yearly roof inspection. MA stated that the skylights are already being inspected as part of the roof inspection.

The 107 door to the roof has wood with sealant on it, and the sealant is failing. The door needs to be resealed. Currently, resealing the door is not included in the quote from the roofer for fixing up the leaks in the roof. MA will ask roofers to fix the door as well (and hopes that it will be at no additional charge).

The ceiling in the common area will stay open until another big rain storm to make sure that the roof patches are holding up. MA to ask unit occupants in the nearby units to keep an eye out for any new leaks.

MA to start asking for estimates to replace the roof.

Repolishing Wood on the Fronnt Doors
On hold.

Renegotiate Insurance Deductible
Our insurance policy will be renewed in August. Can we renegotiate the deductible down to $5K for the common areas. The board thinks that while the deductible of $15,000 is appropriate for individual units, it is hard to manage for the common areas.

Move In Fees
In the efforts of raising income for the association, the board decided to increase the move-in fee for all owners. Starting on June 1st, the move-in fee will be $150 as opposed to $50 (currently).

Miscellaneous

  • The board will consider being approved for a line of credit so that when we are ready to do the work, we can proceed even if we do not have enough cash in the reserves.
  • MA has sent the letter to the 111-11 owners about the AC unit being installed too early in the year.
  • MA to check if there is any money from the city available for dealing with the building settling due to the ground water issues, (when MA calls the city about permission to treat and trim the city trees around the property).
These minutes are written to Yelena’s best recollection. Please notify her of any discrepancies immediately.