Monday, April 28, 2008

Legal Consultation

(04/28/08) MA requested and is waiting for an estimate on legal consultation regarding temp fee increase vs. assessment.

(05/20/08) The legal consultation fee was approved and the letter has been mailed to the owners. Item complete.

Graffiti on 111 Steps

(04/28/08) MA to clean up the graffiti.

(05/20/08) Item complete.

Bad Smell in 107

(04/28/08) MA investigated the smell, caps were tightened, but no explicit problems were found. Doug will report if he detects the smell again.

(05/20/08) Smell is gone. Item complete.

(10/21/08) DM and BG again noticed a strong smell of the sewer in the morning hours in building 107. There is speculation that the smell is from the 107 laundry, or from sewage backing up in the morning rush. Unit 107-20a had to have the drain cleared, and during the procedure a camera was run down the drain. Our buildings are on 4 times/year drain clearing schedule. MA to let the board know next time the drain clearing work occurs, so that we can see if the time of the smell correlates to when the drain clearing is performed.

(11/18/2008) The drain was cleared out today, 11/18. DM will see if the smell is still present tomorrow.

(01/20/2009) Smell still occurring occasionally. DM mentioned that ventilation in skylight is not working and needs to be addressed.

(03/17/2009) The smell is still there, but not as bad. In February, John’s Sewer snaked the main sewer line in 107. The line has a few dips where water holds and at 83 feet line is possibly rotted at bottom. Also the 3 stacks on the roof were video inspected. The stack on the right has a small hole at about 48 ft from the room. Clean out is at 51 ft (white color). Doug inspected the Is the hole in the stack a possible cause of the smell, and can the hole be fixed? Inquire the drain companies. MA to ask Dave Modica and a plumber take a look and provide feedback on the video? Inquire about the possible rotted sewer line. After reviewing the video, DM thought that the middle pipe might also not be draining properly and maybe the cause of the smell.

(05/19/2009) The smell has been cleared for now. The city has cleared out the sewers. Will monitor to see if the smell returns.

(06/16/2009) Smell has lessened to a large degree, but longer term a back-flow valve need to be installed.

(08/18/2009) Doug and Bill have not noticed the bad smell for awhile. Item complete.

(04/20/2010) The smell has returned in 107 (see email from 4/15). The smoke test will be performed to determine where the sewage smell comes from and how bad the damage might be. Smoke test is currently scheduled for Thursday if the city sewage lines are cleared by then on the corner of Queensberry and Jersey Streets.

(05/18/2010) The city attempted smoke test. However something is still blocking the drain. Board was given the phone number of Mike Ross, City council, to call and inquire about if BWSC can move on testing their own drain lines. Dave M indicated that the problem was likely to be on the BWSC lines. So the board will hold on hiring drain company to camera 107’s main drain line until BW&S can camera their sewer lines on the street. BW&S is to let Dave Modica know when they have camera their lines on the street. Dave Modica will continue to call BW&S to learn when their lines have been camera. The association has already paid $1,840 for plumbers to be there with no smoke coming into 107/111, so we want to be sure city does their end well this time.

(06/15/2010) BW&S was at the building yesterday and today with a full crew and a police detail. BW&S was able to pump down far enough to access our lines. BW&S performed a dye test and the dye came back into the BW&S lines; therefore, they were able to determine that the water is flowing from the buildings to the BW&S lines.

BW&S performed a camera test and saw no breaks in the lines. However, there may be a sag in one of our lines, so more investigation is needed. BW&S will gives us their full report.

Questions for Dave Modica
  • When will the BW&S report become available, and would it be possible to get the report by the end of the week?
  • Why did JMechanical charge the association twice?--$1840 and $1780
(07/20/2010) David Modica has been working hard to get this solved. Due to the recent weather, there has been no available manpower to do anything in recent weeks. David has been assured that as soon as possible, there will be another camera test which will investigate a different area.
Still waiting for the report from BW&S.

Doug thinks that there maybe cracks in the foundation or cracks in the sewage pipe. Doug proposes to cut away part of the ceiling in the laundry room where he thinks the pipe is, investigate if there are any cracks, and seal them with cement. Doing that might stop the smell. Doug thinks that the smell is trapped between the 1st floor and the basement ceiling. MA to discuss this solution with David Modica, confirm where the pipe is, and see if this can be done.

MA will repeat the request for the report from BW&S.

Bill has not detected the smell since BW&S has been on site.

JM Mechanical: David Modica has indicated that he does not believe we can get either of the two invoices reduced because the smoke tests were ordered, and the manpower utilized.

(08/17/2010) The BWS contractors have found the problem. The pipe in the street is not only sagging, but also collapsing.
This is now a major problem that with effect the entire block. The city will now have to rip up the entire street from Queensberry to Perterbourgh in order to fix the problem. The time line for this work is not known, but the smell can intensify at times until the problem is repaired. David Modica continues to work with BWS to try to get some idea of what it is involved for going forward.

DM met with David Modica in the laundry room and looked into the cut in the slab. Failed pipe (in the street) was leaking and filling up the space under the slab. The town should fix the pipe.

Damanged Bollards by the Dumpsters

(04/28/08) The bollards have been bent out of place again. MA to straighten them out and to pour concrete around them.

(05/20/08) The bollards have been straightened out, but not reinforced with concrete yet. David M. will discuss this with C&P when they are onsite.

(06/24/08) The bollards have been straightened out but not reinforced. David M. will work with C&P to see if they can be reinforced with concrete.

(07/15/08) Same.

(08/19/08) C&P has straightened the bollard, and will do something to stabilize it at no extra charge to the association.

(09/16/2008) Same.

(11/18/2008) Cement has been poured, and the bollards for straight for a few days. One bollard was bent again despite the cement. Waste Management is yet to contact KL. The board decided to cut down the bent bollard, and place reflective tape on top of the other two bollards.

(01/20/2009) Item complete.